Packaging from
4 till 80m2
INSTALLATION :

- Insert COBRA into the groove channel
- Posistion the next board and insert the other COBRA fasteners
- Tighten the COBRA screws down with the provided bit

COBRA® Installation (pdf)

Download Flash player to see the video


DESINSTALLATION :

- Unscrew the fastener used to attach the damaged board.
- Slide the COBRA into the board's sides
- Remove the board – replace it
- Bring back the COBRA on both board's sides
- Screw

Notice de désinstallation Cobra® (pdf)

Download Flash player to see the video

  Bag
90 fasteners
Tray pack
10 bags
Master carton
2 tray packs
Width 150mm 300mm 600mm
High 200mm 190mm 380mm
Depth 30mm 180mm 360mm
Weight 900 gr 9 kg 90 kg
Fasteners 90 10 x 90 = 900 2 x 10 x 90 = 1800
Surface covered 4m2 40m2 80m2